Company News

News Center

Uzbekistan President's Site Investigation of Tashkent Construction Project of TYSIM Foundation


Release time:

2023-12-02

On November 16, 2023 local time, Uzbek President Mirziyoyev and his party visited the pile foundation project of the traffic hub tunnel in the capital Tashkent New Town for field investigation and supervision. Ye Anping, general manager of Wuxi TYSIM Foundation Engineering Co., Ltd., and Zhang Erqing, head of the project department, accompanied the introduction of the site construction.

Local timeOn November 16, 2023, Uzbek President Mirziyoyev and his party visited the tunnel pile foundation project of the new town transportation hub in Tashkent, the capital, for field investigation and supervision. Ye Anping, general manager of Wuxi TYSIM Foundation Engineering Co., Ltd., and Zhang Erqing, head of the project department, accompanied the introduction of the site construction.


    The project is an important infrastructure construction with the participation of local partners of TYSIM Machinery, which is located in the central area of Tashkent, the capital of Uzbekistan. It is reported that TYSIM Foundation has sent a professional team to provide project management and construction method support. Local PartnersThe AVP Group is committed to contributing to the economic development and infrastructure development of the region. This project is planned to last for 4 months. The pile foundation is located near the river beach, with a pile diameter of 1 m and a pile depth of 24 m. The main geological distribution is large-size pebbles and loose sand layers with a diameter of more than 35cm. The pebble layer of the project is difficult to drill, the sand layer is easy to collapse, the construction period is tight, and the construction is difficult. In order to ensure the smooth construction and timely completion of the project, the person in charge of TYSIM foundation and chief technical engineer have formulated a detailed construction plan according to the actual situation on the site. The construction efficiency exceeds that of the same level of equipment on the site by using the high-efficiency and high-reliability Caterpillar chassis KR220C and KR360C rotary drilling rigs, crawler telescopic boom cranes, loaders and excavators.

 

During the inspection, the Uzbek president learned in detail about the project's construction planning and on-site construction, and spoke highly of the hard work of the on-site personnel. He pointed out that the construction of the project is of great significance in promoting local regional economic development, improving people's livelihood and well-being, improving the image of the city and environmental quality, and hopes that Chinese enterprises can continue to maintain high standards of work quality and ability.

The president of Uzbekistan visited the project site in person, which also established a good image and reputation for Chinese enterprises in overseas construction projects, and will further promote the cooperation and exchanges between China and Uzbekistan in economy, trade and investment.