News Center
TYSIM Foundation Clearance Rotary Excavation KR300ES Helps Lu 'an High-speed Railway Construction Project
Release time:
2021-12-10
TYSIM Foundation is a leasing and construction platform dedicated to small and medium-sized rotary drilling rigs set up by TYSIM Machinery. After five years of accumulation and investment, and customer cooperation or independent construction, with small rotary drilling rig to complete the fishing light complementary, dam reinforcement, underground pipe gallery, water construction and other new areas of construction applications, for the domestic small rotary excavation method to contribute to the promotion and application. There is reason to believe that, as the same platform enterprise of TYSIM Machinery, TYSIM Foundation will become the leading construction enterprise and platform leasing enterprise of small and medium-sized rotary drilling rigs in China.
Recently, Tai HengFoundationLow headroomKR300ES entered Anhui and participated in the construction of Anhui Lu 'an Shanghai-Chengdu Line 142No.bridge pier reinforcementEngineering.

The project is adjacent to the high-speed rail in operation.LineIt is required that the height of construction equipment shall not exceed12m, pile diameter800mm, hole depth 27m. Site construction formationGeologyMainlyBackfill layer, silt layer, powderSoil layer,Astrowindred sandstone,The strength of the red yarn rock reaches35MPa,Equipment requiredHaveStrong power and ability to enter rock,During constructionThere is a risk of hole collapse, which will cause ground subsidence and affect the operating high-speed railway.Difficulty of constructionPoleBig, Tai HengFoundationThe professional construction team shall provide countermeasures according to the site conditions, and first use the full-swing equipment to lower the casing.15 m,AgainUse TYSIMFoundationHeightRotary excavation with low clearance of 11 mKR300ESBorehole and borrow soil, and finally gnaw the hardest weathered red yarn with its strong rock-entering capacity.. Full turning equipment height2.5 meters, the height of the drilling bucket of TYSIM KR300ES is about 2 meters from the ground, and the construction platform of TYSIM KR300ES is raised about 1 meter on site, which solves the problem of the coordination of the drilling rig and the full rotation height.Question.TYSIMBased on professional, timely and thoughtful service, customer-centered, with professional business quality, with advanced construction technology,For the customer efficient, high quality completed the construction task.


If a product is the life of an enterprise, then technological innovation is the soul of a product.
TYSIM FoundationIn response to the different needs of customers, for the construction of buildings and large tunnels, bridges and high-voltage lines and other environments.Working condition,A highly targeted technical programme has been developed.Special modelsKR300ES low headroom rotary drilling rigConstruction height11 meters,Maximum drilling depth35m, the maximum drilling diameter is 2m, and the maximum output torque is 320kN.m. Since it was put into the market, it has been recognized and praised by customersThusWon the trust and support of our customers.
TYSIM is based on TYSIMMechanicalThe establishment is committed to small and medium-sized rotary drilling rig leasing, construction platform. After five years of accumulation and investment, and customer cooperation or independent construction, with small rotary drilling rig to complete the fishing light complementary, dam reinforcement, underground pipe gallery, water construction and other new areas of construction applications, for the domestic small rotary excavation method to contribute to the promotion and application. There is reason to believe that as the same platform enterprise of TYSIM Machinery, TYSIM Foundation will become China'sSmall and medium-sized rotary drilling rigof the leadConstructionEnterprise and platform leasing enterprises.
Related News
2026-06-01