Company News

News Center

TYSIM Foundation Helps Wuxi World Internet of Things Expo Permanent Site Supporting Facilities Construction


Release time:

2021-10-23

TYHEN, Low headroom KR300ES, A classic building, a label for the city, A group of classic buildings, is an era, We create the foundation of the times.

A

Build dreams with ingenuity and forge ahead.

Co-spectrum Shengshi Huazhang

Recently, TYSIM Foundation Integral Transportation Rotary Drilling Rig KR125/KR90 participated in the construction of supporting facilities for the permanent site of Wuxi World Internet of Things Expo. Wuxi TYSIM Foundation is committed to the local construction of Wuxi. Following the completion of Wuxi Seventh People's Hospital, Liangxi District Hospital of Traditional Chinese Medicine and Huishan First People's Hospital, Wuxi TYSIM Foundation has once again made a modest contribution to Wuxi's infrastructure construction.

 

The project is located on the southwest side of the intersection of Zhenze Road and Qingshu Road in Wuxi Economic Development Zone. The construction unit is Wuxi International Conference Center Co., Ltd. The total construction area of the project is about 10 hectares, and the total construction area is about 207000 square meters, of which the above-ground construction The area is about 130000 square meters and the underground construction area is about 77000 square meters. The main functions are conference center and supporting hotels. As the permanent venue of the World Internet of Things Expo, the completion of the project will bring a world-class international conference center to Wuxi Taihu New City and create a shining new city center.

 

 

The territory of Wuxi City is dominated by alluvial and lake plains, with well-developed surface water systems and dense river networks. In addition to Taihu Lake, the Beijing-Hangzhou Grand Canal runs through the urban area, the Xicheng Canal and the Xibei Canal connect the Yangtze River, and the Liangxi River and Yangxi River lead to Taihu Lake. The geological conditions of the site are mainly backfill stratum, silty clay, silty clay with silt, silt and silty clay. The construction site is close to Taihu Lake, with high underground water level, which makes the construction difficult. In particular, the silt and silty clay with silt (soft plastic state) stratum are easy to collapse, and the process method of mud wall protection is required. The on-site bored pile diameter is 800mm and the hole depth is 21m. TYSIM Machinery is equipped with skilled operators for more than 3 years. It is necessary to strictly control the drilling speed and the lifting and releasing speed of the drill pipe to effectively prevent hole collapse. The average hole forming time is controlled at about 50 minutes, which increases the construction efficiency, increases the construction volume for customers, shortens the construction period and creates greater value.

 

 

Wuxi TYSIM Foundation Engineering Co., Ltd. is a professional enterprise with "service" as the core, focusing on the sales, leasing, construction, replacement, remanufacturing, service, labor and training, construction method consultation and promotion of small and medium-sized piling machinery. At present, it has completed the construction application in various new fields such as the Tiantai photovoltaic fishing and light complementary project, the Nanjing Grand Canal dam reinforcement project, the urban underground pipe gallery project of Hanzhong and Han cultural venues, and the water construction of Jiaxing river landscape road, and accumulated a lot of construction experience. TYSIM Foundation will cooperate with customers in depth in the field of foundation construction, customize appropriate equipment, provide construction solutions, improve construction efficiency, provide different rental value-added services, and create value for customers.